Signal Box and Signals

The signal box on the layout is the ‘Period Signal Box’ R9729 from the Hornby Skaledale range. The signal box building has been cut in half to save space on the layout.

The signal on the layout is a dual head, two aspect home signal, made by Train Tech, reference SK7 and is used for the purpose of platform starting signals on the layout. The signal has been modified by increasing the height of the signal heads, so they are clear of the train roofs, this was achieved using two strips of styrene sheet.

picture157

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s