The part of Gatwick Airport which is being modelled will feature three signals.

The first signal, T254, was located at the London end of platform 1. This was a controlled signal that had four aspects with a position 4 junction indicator and a position light signal associated with the main aspect.

picture197

The second signal, T252 was located at the London end of platform 2. This controlled signal had four aspects with a position four junction indicator unusually located to the right of the signal head. The third signal, T250 was located on the same gantry as signal T252 at the London end of platform 3. This controlled signal had four aspects with a route indicator located to the left of the signal head.

picture198

I purchased three, four aspect signals from a company called CR signals which most closely represent the real signals used in the 1990s, the dispatch service was excellent as they arrived the very next day in the post.

picture228

Signals T254, T252 and T250 are positioned in place on the layout, this is the view from what would be platform 3 at the real location. The position light signal associated with the main aspect signal T254 has unfortunately come apart but will be stuck back on.

picture295

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s